PCRLJN 2017

2017 P Cr (PLP)

ABDUL LATEEF and others — Petitioners Versus CHAIRMAN, NATIONAL ACCOUNTABILITY BUREAU ISLAMABAD and others — Respondents

Jurisdiction / Court
Sindh
Decided Date
2016-April-27
Honorable Judges
N/A
Case Reference Summary (AEO Optimized)
Citation 2017 P Cr (PLP)
Forum / Court Sindh
Bench Members N/A
Parties ABDUL LATEEF and others — Petitioners Versus CHAIRMAN, NATIONAL ACCOUNTABILITY BUREAU ISLAMABAD and others — Respondents
Primary Law (b) National Accountability Ordinance (XVIII of 1999), (a) National Accountability Ordinance (XVIII of 1999)
💡 Quick Legal QA & Summary / سوال و جواب خلاصہ
Q1: What are the key laws and sections cited in 2017 P Cr (PLP)?

This judgment primarily cites: (b) National Accountability Ordinance (XVIII of 1999), (a) National Accountability Ordinance (XVIII of 1999) as referenced in Pakistani case law index.

Q2: Which judicial bench decided the case 2017 P Cr (PLP)?

The case was heard and decided by the Sindh bench comprising: N/A.

Q3: What is the official citation format for this judgment on Pakistan Law Portal?

Cite this legal precedent as: 2017 P Cr (PLP) (ABDUL LATEEF and others — Petitioners Versus CHAIRMAN, NATIONAL ACCOUNTABILITY BUREAU ISLAMABAD and others — Respondents). Read the full summary and cross-referenced laws free on Pakistan Law Portal.

Laws Cited

(b) National Accountability Ordinance (XVIII of 1999) (a) National Accountability Ordinance (XVIII of 1999)

Representation

  • Munsif Jan for Petitioners (in C.P. No. D-1775 of 2015).
  • G.M. Bhutto for Petitioners (in C.P. No. D-2083 of 2015).
  • Kumail Ahmed Sherazi for Petitioner (in C.P. No. D-2967 of 2015).
  • Maula Bux Bhutto for Petitioner (in C.P. No. D-2996 of 2015).
  • Shamshad Narejo and Imam Bux for Petitioner (in C. P. No. D-446 of 2016).
  • Noor Muhammad Dayo, ADPGA, NAB for Respondents.
  • 6. Learned counsel for petitioner No.1 (Hussain Bux Narejo/accused No 1 in reference) C.P. No.D-466 of 2016 who is currently on ad interim pre-arrest bail by order of this Court dated 9-6-15 and was the ex store incharge OGDCL argued that he was completely innocent and that he had been falsely implicated and those who also bore responsibly such as the guards who were meant to check the tankers had been let off. Furthermore, all his signatures on the invoices were false and as such his pre arrest bail should be confirmed. He also placed reliance on the cases of Rehmatullah v. State (2011 SCMR 1332) and Haji Mian Addul Rafique v. Riazuddin (2008 SCMR 1206).
  • 7. Learned counsel for petitioner No.2 (Abdul Latif/accused No.2 in the reference) in C.P. No.D-1775/2015 who is currently in jail was technical officer of OGDCL submitted that he is completely innocent and his arrest is illegal, unlawful, false, fabricated and concocted as the same did not disclose any commission of offence as the petitioner has nothing to do with the alleged pilferage of diesel. He further contended that some of the other co-accused were on bail and as such he was also entitled to bail based on the rule of consistency. Furthermore all his signatures on the invoices were false and there was no other evidence against him to connect him to the commission of the offense and for all the above reasons he is entitled to be enlarged on bail.

Headnotes / Summary

Ss. 9(a) & (b)

Bail, refusal of

Causing loss to government

Petitioners were officials and contractors of Oil and Gas Development Corporation Limited and they caused loss to the Corporation to the extent of Rs. 182.025 million for non-supply of High Speed Diesel for which advance payment had been received

Petitioners sought bail in the case being investigated by NAB

Validity

Accused had been paid full amount of oil which was not delivered and as such they were the beneficiaries

If someone was paid in full for a non-supply, the only reasonable inference was that such person was also giving someone else a cut for doing the same, such as accused persons did

Reasonable grounds existed to believe that there was sufficient evidence to connect accused persons to the commission of offence

Bail was refused in circumstances. [Paras. 23 & 26 of the judgment]

Ss. 9(a) & (b)

Pre-arrest bail, grant of

Case of further inquiry

Sub-contractor

Causing loss to government

Petitioner was a sub-contractor who was under investigation by NAB along with other accused persons who were officials and contractors of Oil and Gas Development Corporation Limited

Allegation against all the accused persons was that they caused loss to the Corporation to the extent of Rs. 182.025 million for non-supply of High Speed Diesel for which advance payment had already been received by them

Validity

Accused was sub-contractor who was not officially or as per contract, as such he would not have known that main contractor had no legal right to sublet a part of contract to him

Accused played a lesser role in the scam and his case was one of further inquiry

Pre-arrest bail was confirmed in circumstances. [Para. 25 of the judgment]

Judgment & Decree

MOHAMMED KARIM KHAN AGHA, J.

By this single order, we intend to dispose of the above mentioned petitions filed on behalf of the petitioners for bail, whereby the petitioners are involved in corruption and corrupt practices which comes within the ambit of section 9(a), National Accountability Ordinance, 1999 (NAO) which lead to National Accountability Bureau (NAB) filing NAB Reference No.14/2015 against the petitioners on 15-05-2015 before the Administrative Judge Accountability Courts at Karachi.

2. The facts of the case as per reference are that on a complaint by Oil and Gas Development Company Limited (OGDCL) dated 23.10.2012 alleging therein that Mr. Hussain Bux Narejo (accused No.1) in connivance with Chaudhry Abdul Latif (accused No.2) and others have caused loss of Rs.230 million by pilferage of diesel of OGDCL at Tando Alam Logistic base NAB opened an inquiry. NAB's investigation revealed that OGDCL Tando Alam is the Logistics base which supplies High Speed Diesel (HSD) purchased from Pakistan State Oil (PSO) to the vehicles of all Logistic bases (i.e. Kot Addu, Kot Sarang, Tando Alam etc). The Investigation further revealed that supply process starts with requisition of HSD from logistic base OGDCL to PSO. Then the HSD truck arrives at the main gate of the OGDCL Logistic base where at the main gate security guard checks the said truck and demands the supply documents from the driver and gives the same to the security inspector. In the documents if found that the said HSD Truck is meant for logistic field then it would be allowed to enter into the logistic field after making entry in the incoming register containing the information regarding name of driver, vehicle number, invoice number, quantity of diesel and the date. Thereafter one security guard or security inspector accompany the said vehicle to store incharge logistics, where the quantity of diesel is checked through dip rod and the same is recorded on the backside of the invoice. The said truck is unloaded in the storage tank of the logistics field base. The empty HSD truck is again thoroughly checked at the main gate by security staff by way of opening all the values of the truck to ascertain that the truck is fully emptied and then allow the truck to leave the logistics field while putting signatures of security personal, store incharge and operational manager or his reliever. The investigation report revealed that demand/requisition of HSD is generated through accused No.1 Hussain Bux Narejo duly signed by operational manager after or his reliever and faxed to PSO office. PSO as per rules forward the same to concerned who would direct the PSO depot to supply the same and generate three invoices showing tanker number, name of carrier contractor, quantity and date etc. The contractor is responsible for delivery of the same at the destination i.e. OGDCL Tando Alam Base. Before entry into OGDCL complex security personnel make entry in the register and will sign on the back of receipt. Store incharge and operational manager also sign on the back of the invoice, which shows the token of receiving. After signature PSO contractor submit their bill for payment of transport charges from PSO and PSO claim same amount from OGDCL.

3. As per statement of witnesses and entry register, 195 HSD Bowzers/Tankers having 2940000 liters of HSD amounting to Rs.182,025,383/- were never received at OGDCL Tando Alam Logistic Base, however accused No.1 in connivance with other accused through fake signatures pilfered/embezzled the said quantity of the HDS. The investigation further revealed that Logistic Base OGDCL Tando Alam purchased 6804059 liters of HSD for the period 2006-2011. Accused Nos.1 and 2 made fake entries in store documents which shows as HSD issued/consumed, when the consumption was checked through log books of all vehicles which entered into Logistic Base Tando Alam, it transpired that 3492131 liters of HSD is pilfered/embezzled. It was proved beyond any doubt that 195 HSD Bowzers/Tankers having 2940000 liters total amounting to Rs.182,025,383/- never entered into OGDCL Logistic Base Tando Alam and sold by accused Nos. 1 to 9 in connivance with each other. According to PSO invoices and documentary evidence following Bowzers did not enter into ODGCL Tando Alam, however the amount of the same was reimbursed to PSO on the basis of fake signature made by accused Hussain Bux Narejo in connivance with co-accused Abdul Latif. As per Agreement with PSO, Supply Contractors of PSO and Vehicle Owners are responsible for delivery of HSD at OGDCL Tando Alam Logistic Base, however they failed to deliver the same hence they are responsible to make good the loss caused to Government exchequer. Details of Tanker/Lorry No. along with Primary Contractor and Vehicle Owner is as under: Name of Carriage Name of the Primary Contractor Name of the Owner of Lorry/ Tanker Quantity Amount involved Tanker Lorry No. Abbas & Co. Sajid Ali son of Hazoor Bux 220000 8,238,583 CI-1627 PP-0018 TTA-499 KTA-30 45 QAC-8845 Raza and Co. Kalb-e-Abbas Shafiq Ahmed Soomro 2600000 167888415 JP-0839 JP-1310 LSA-8068 MNN-2265 QAC-7027 QAC-8845 QAD-9256 QAE-3005 TTA-023 TTB-241 DNB-3545 TTB-241 Prince Enterprises Saiful Malook Ghullam Nabi Jokhio 30000 2,075,444 TTA-264 Jawaid Brothers Muhammad Saeed Khan 15000 566,240 QAC-8845 Jabbar Enterprise Syed Abdul Jabbar Gardezi Shafiq Ahmed Soomro 75000 3,256,701 JP-1319 Total 2940000 182,025,383

4. As per investigation report, year wise breakup of HSD did not enter/receive at OGDCL Tando Alam is as under: Sr. No. Year Quantity Value in Rs. 01 2006 90000 3,397,440/ 02 2007 310000 11,605327/- 03 2008 810000 45,134,225/- 04 2009 590000 36,205,715/- 05 2010 1020000 76,002,558/- 06 2011 120000 9,680,118/- Total 2940000 182,025,383/-

5. In view of the above, as per NAB reference it has been established that the accused Nos.1 to 9 in connivance with each other fraudulently embezzled an amount of Rs.182.025/ - million and caused loss to the government exchequer. Thus the accused persons have committed the offence of corruption and corrupt practices as envisaged under section 9(a) of the N.A.O., 1999 punishable under section 10 of the Schedule thereto.

6. Learned counsel for petitioner No.1 (Hussain Bux Narejo/accused No 1 in reference) C.P. No.D-466 of 2016 who is currently on ad interim pre-arrest bail by order of this Court dated 9-6-15 and was the ex store incharge OGDCL argued that he was completely innocent and that he had been falsely implicated and those who also bore responsibly such as the guards who were meant to check the tankers had been let off. Furthermore, all his signatures on the invoices were false and as such his pre arrest bail should be confirmed. He also placed reliance on the cases of Rehmatullah v. State (2011 SCMR 1332) and Haji Mian Addul Rafique v. Riazuddin (2008 SCMR 1206).

7. Learned counsel for petitioner No.2 (Abdul Latif/accused No.2 in the reference) in C.P. No.D-1775/2015 who is currently in jail was technical officer of OGDCL submitted that he is completely innocent and his arrest is illegal, unlawful, false, fabricated and concocted as the same did not disclose any commission of offence as the petitioner has nothing to do with the alleged pilferage of diesel. He further contended that some of the other co-accused were on bail and as such he was also entitled to bail based on the rule of consistency. Furthermore all his signatures on the invoices were false and there was no other evidence against him to connect him to the commission of the offense and for all the above reasons he is entitled to be enlarged on bail.

8. Learned counsel for the petitioner No.3 (Syed Abdul Jabbar Gardezi/accused No.4 in the reference) and is currently on ad interim pre arrest bail by virtue of this Court's order dated 27-5-2015 in C.P. No.D-2996/2016 was one of the main contractors with PSO to transport the HSD by truck to and from the logistics base argued that he was completely innocent and even otherwise the selection of the case for investigation or any possible trial in the court of law is in violation of principle laid down by the superior court as this matter does not fulfill the purposes for which National Accountability Bureau has been created. That there is not a single piece of evidence against him and as such his ad interim pre arrest bail should be confirmed.

9. Learned Counsel for the petitioner No.4 (Kalb-e-Abbas accused No.7 in the reference) and is currently on ad interim pre arrest bail by virtue of this Court's order dated 27-5-2015 in C.P. No.D-2967/2015 who was one of the main contractors with PSO to transport the HSD by truck to and from the logistics base argued that he was completely innocent and that he had simply performed his role as was provided for in the cartage agreement dated 29.3.1983 between himself and PSO. He further contended that the mala fide and ulterior motives of the respondent No.6 (the NAB IO) can be gauged from the fact that the focus and crux of the enquiry had been turned towards the actual owners, drivers of the cartage vehicles (Petrol tankers) and in this regard the petitioner had informed the respondents that he is neither the owner nor did he at any material time have control over the drives making the delivery. He further contended that all the invoices had been duly signed and that PSO had no complaint with respect to his services and had paid his invoices. That although his cartage contract with PSO did not entitle him to sublet his contract, which he was doing, this was accepted by PSO as a matter of practice. Furthermore, no PW had deposed against him and he had not been mentioned in any of the section 161 Statements and as such he was entitled to the confirmation of his ad interim pre-arrest bail.

10. Learned Counsel for the petitioner No.5 (Shafiq Ahmed/accused No.8 in the reference) who is currently on ad interim pre arrest bail by virtue of this Court's order dated 17-4- 2015 in C.P. No.D-2083/2015 argued that he was a lower level transporter for carrying diesel within the territory of Sindh, now a days he is working with other goods companies from time to time but not permanently with any company and is poor and innocent person, having small family and the petitioner is not government employee of OGDCL or Government Contractor and so far allegation against him of being involved in the pilferage of diesel is concerned it is false, baseless and there is no evidence to support it. In essence he is only a sub-contractor of one of the main contractors and for all the above reasons his ad interim pre arrest bail should be confirmed.

11. On the contrary, Learned ADPGA for NAB has submitted that the petitioners have all been assigned specific roles in the commission of offence which has led to the fraudulent embezzlement of Rs.182,025/- million which caused a massive loss to the Government exchequer and in respect of all the petitioners there is sufficient material on record to prove the guilt of the petitioners beyond a reasonable doubt, hence the petitioners are not entitled for concession of bail and hence the petition for post arrest bail by petitioner No.2 should be dismissed and the ad interim pre arrest bail orders granted to all the other petitioners should be recalled.

12. We have carefully perused the record, considered the law and the submissions of learned counsel at the bar.

13. We would like to make it clear that as per settled law on the grant of bail we have only made a tentative assessment of the material placed before us and that this order shall not prejudice the case of any party at trial whose case shall be decided on merits based on the evidence produced before the trial court.

14. Turning firstly to the case of petitioner No.1 (Hussain Bux Narejo/accused No 1 in reference). He has been assigned a specific role in the reference as under: "Accused No.1 Hussain Bux Narejo, being Store Incharge was responsible for receipt of HSD at Tando Alam Base and its consumptions but as per record 2940000 liters of HSD is pilferage through fake signatures and entry on weekly statement. He therefore in connivance with Ch. Abdul Latif and Carriage Owner/drivers caused loss of Rs.182.025 million."

15. Being store incharge he was responsible for any shortages in diesel. Although no handwriting expert was used for checking his signatures however he has been fully implicated in the offense by the following witnesses in their statements which are mainly corroborative of his actions of making false entries of tankers which in fact did not enter the Logistics base. These witnesses include Niaz Ali Arbab Manager Operation OGDCL Logistic Field Tando Alam, Nazakat Ali Lund Security Inspector Logistic base OGDCL Tando Alam, Mohammed Lakhan Dino Security Inspector logistic field Tando Alam, Mohammed Irfan Hussain and Ghulam Murtaza both Technical Officer Logistic OGDCL Tando Alam and others. A number of PW's who have already recorded their evidence before the trial court have also fully implicated him in the offense.

16. The authorities relied on by his counsel are of little, if any, assistance to the petitioner since they concern cancellation of bail when the trial is almost over but this is not the case in these petitions and as such are distinguishable.

17. Thus, in our considered view there are reasonable grounds to believe that there is sufficient evidence to connect petitioner No.1 to the commission of the offense and as such his order for ad interim pre arrest bail dated 9-6-15 is hereby recalled.

18. Turning to the case of petitioner No.2 (Abdul Latif/accused No.2 in the reference). He has been assigned a specific role in the reference as under: "Accused No.2 Abdul Latif was associate of Hussain Bux Narejo and taken his share for signature on Store documents and failed to inform the seniors. He was receiving his share from main culprit Hussain Bux Narejo and in return he signed the Store Documents which shows fake consumption. He admitted his guilt before departmental inquiry officer and returned the amount of Rs.200,000/- vide cheque No.4603108 of account No.0010411857 of UBL." (bold added).

19. Petitioner No.2 was an OGDCL employee working closely with petitioner No.1 (Hussain Bux Narejo).He has denied his signatures on all the invoices. However, not only do various witness statements such as Manther Ali Store man incharge logistics store ODCL Tando Alam fully implicate him but a handwriting expert in his report dated 22-3-16 have found his signatures on the invoices to be genuine. A PW at trial has also fully implicated him in terms of his repaying RS 200,000 on account of his involvement in the offense.

20. Thus, in our considered view there are reasonable grounds to believe that there is sufficient evidence to connect petitioner No.2 to the commission of the offense and as such his petition for post arrest bail is dismissed.

21. Turning next to the cases of petitioner No.3 (Syed Abdul Jabbar Gardezi/accused No.4 in the reference), petitioner No.4 (Kalb-e-Abbas accused No.7 in the reference) and petitioner No.5 (Shafiq Ahmed/ accused No.8 in the reference).

22. They have been given a specific role in the reference as under: "Syed Abdul Jabbar Gardezi accused No.4, Kalb-e-Abbas accused No.7 Carriage Contractors and Shafiq Ahmed Soomro accused No.8 Owners of bowzers/tanker mentioned in para 6 of this reference. As per PSO Agreement they are primarily responsible for delivery of HSD to the destination but they further let out the contract and hired private vehicles. Such vehicles did not enter into OGDCL complex Tando Alam therefore they are responsible to make good the loss caused to OGDCL. If they would had strong check then such fraud could not have been committed".

23. The petitioners 3 and 4 have admitted that they illegally sublet their obligations to supply tankers for the logistic base at Tando Alam in breach of their cartage agreements with PSO. Furthermore, the scam could not have taken place without the active connivance of the contractors. The contractors were paid in full for oil which was not delivered and as such they were beneficiaries. Common sense would dictate that if you are being paid full for a non-supply the only reasonable inference is that you are also giving someone else a cut for doing this such as petitioners 1 and 2.

24. Thus, in our considered view there are reasonable grounds to believe that there is sufficient evidence to connect petitioners Nos.3 and 4 to the commission of the offense and as such their respective orders for ad interim pre arrest bail both dated 27-5-2015 are hereby recalled.

25. With regard to petitioner No.5 he was a sub-contractor who was not officially or as per contract connected with PSO and as such he would not have known that the main contractor had no legal right to sublet a part of the contract to him. He seems to have played a lesser role in the scam and his case appears to be one of further inquiry as such in our view his order dated 17-4-2015 for ad interim pre arrest bail is hereby confirmed.

26. In summary.

1. Petitioner No.1 Hussain Bux Narejo's order for ad interim pre-arrest bail dated 9-6-2015 is hereby recalled.

2. Petitioner No.2 Abdul Latif's petition for post-arrest bail is dismissed.

3. Petitioner No.3. Syed Abdul Jabbar Gardezi's order for ad interim pre-arrest bail dated 27-5-2015 is hereby recalled.

4. Petitioner No.4 Kalb-e-Abbas's order for ad interim pre-arrest bail dated 27-5-2015 is hereby recalled.

5. Petitioner No.5 Shafiq Ahmed's order for ad interim pre-arrest bail dated 17-4-15 is hereby confirmed. MH/A-51/Sindh Order accordingly.